SWITCHER SYSTEM ADVANTAGES
01 UP TO 5 MINUTES
Time required to deploy the knuckle-boom cranes to full reach, including lowering the outriggers and positioning the support pads: up to 5 minutes
02 UP TO 30 MINUTES
Achievable total time for unloading a switch panel or connecting rails: 30 minutes (0.5 h); frog panel: 20 minutes (0.3 h)
03 60 SECONDS



